Vorgeschlagene Suchanfragen
Filtern und downloaden Sie spezifische Informationen nach Stichworten.
220/33 kV substation for steel plant - 40.5 km total length
Underground tunnel project for 400 kV cables to optimize enery supply for southern London - 30 km total length
Nu kan du få halogenfri flexrør med ledninger på QADDY®. Fleksible flexrør med ledninger benyttes til både åbne og skjulte installationer. Kan indstøbes i beton.
Qaddy® is now available with halogen-free flextube wire. Flexible tubes with pre-wired conductors can be used for both open and closed installations and can be embedded in concrete.
The Martin Linge oil and gas field is located in the North Sea offshore Norway, close to the border to the UK continental shelf. The owner Equinor wanted to power the offshore activities from the onshore power grid instead of using onsite generators.
NordBalt is a joint project of the Swedish and Lithuanian TSOs (transmission system operators) Svenska kraftnät and Litgrid AB. It is part of Lithuania’s long-term strategy to secure its energy independence by interconnecting the power grids of the Baltic countries with other grids.
With expected resource base of 2.7 billion barrels of oil equivalents, Johan Sverdrup is one of the most important industrial projects in Norway in the next 50 years. Peak production is estimated to be 660,000 barrels of oil per day.
The Nordergründe wind farm, located in the North Sea off the coast of Germany, is part of Energiewende, the German government´s strategy to increase the share of renewable energy in the national energy mix.
The Goliat oil and gas field, 105 km off the Northern coast of Norway, was discovered in 2000 and is operated by Eni Norge. The production of oil and gas from a FPSO (floating, production, storage and offloading) platform started in 2016.
The Horns Rev 3 wind farm is located in the North Sea, about 30 km off the western-most point of Denmark, Blåvands Huk, and not far from the city of Esbjerg. The 400 MW (megawatt) wind farm has the capacity to supply electricity to around 400,000 households.
Our pioneering HVDC transmission cable system was laid in 1953, between Västervik and Ygne. The link had a rated voltage of 100 kV (kilovolt) and a transmission capacity of 20 MW (megawatt).
Produkte & Lösungen
Über NKT
Ihre Karriere
Nehmen Sie Kontakt zu uns auf
Melden Sie Ihr Anliegen
Folgen Sie uns auf
© NKT A/S